Inaugurated
- Meaning in English: To formally open or introduce something, especially an official or significant event.
- Meaning in Urdu: افتتاح کرنا
Baseload
- Meaning in English: The minimum amount of electric power needed to be supplied to the electrical grid at any given time.
- Meaning in Urdu: بنیادی لوڈ / مستقل ضرورت
Levelised
- Meaning in English: The cost measure used to compare the cost of generating electricity from different sources over their entire life cycle.
- Meaning in Urdu: اوسط لاگت
Unsustainable
- Meaning in English: Unable to be maintained at the current rate or level, often leading to exhaustion of resources.
- Meaning in Urdu: ناقابلِ برداشت / غیر پائیدار
Curtailment
- Meaning in English: The act of reducing or limiting something, especially usage or demand.
- Meaning in Urdu: کمی / تخفیف
Non-utilisation
- Meaning in English: The state of not being used or not being used to its full potential.
- Meaning in Urdu: عدم استعمال
T&D Losses (Transmission and Distribution Losses)
- Meaning in English: Losses of electricity that occur during transmission and distribution from the power plant to the end user.
- Meaning in Urdu: ترسیل اور تقسیم کے نقصانات
Loadshedding
- Meaning in English: The deliberate shutdown of electric power in parts of a system to prevent the entire system from failing when demand exceeds supply.
- Meaning in Urdu: لوڈشیڈنگ / بجلی کی معطلی
Tariff
- Meaning in English: A schedule of rates or charges for the use of a service, especially electricity or other utilities.
- Meaning in Urdu: ٹیرف / نرخ نامہ
Cross-subsidy
- Meaning in English: A system where the cost of one service is supported by higher prices charged for another service.
- Meaning in Urdu: کراس سبسڈی
THE prime minister inaugurated Chashma-5, a 1,200 MW nuclear plant, after Ecnec approval in July 2023. The project reportedly cost around $4 billion. However, it appears that we have decided to spend this money on an unnecessary project when the country is on the brink of economic collapse.
In 2021, the Council of Common Interests approved the National Electricity Policy. The policy aims to provide affordable electricity. It requires planners to use modelling for generation expansion planning. They must choose the least-cost technology and fuel.
Chashma-5 was not selected in the generation plans in any modelled scenario. Cheaper options exist to meet the projected demand. Chashma-5 replaces Thar coal in the expansion plan, the other baseload option. A 2021 analysis found that Chashma-5 would raise total annual power costs by $500 million compared to the least-cost plan.
The Pakistan Atomic Energy Commission supports Chashma-5, citing its low cost over the project’s 60-year lifespan. However, the levelised cost is not the right measure. The first 20 years of the tariff, which include the debt repayment period, are more relevant for analysis.
Nuclear power generation is no longer a strategic investment for Pakistan as it once was. It is only a technology choice now — an expensive choice. There is no technical or economic justification for this choice. Today, solar projects can replace some existing power schemes if their tariff is below the variable generation cost. Otherwise, Pakistan does not have a supply problem today; it has a demand problem.
One of the issues at the root of Pakistan’s electricity problems is unsustainable demand.
Pakistan has seen electricity as a supply problem. It has invested in new power projects, ignoring their long-term impact. The generation pipeline, even without Chashma-5, is unaffordable. The cost of power will further increase with the planned generation projects. Engineers plan the power capacity to meet 100 per cent of the peak demand. The quality of demand is not a criterion. Low-quality demand is electricity consumption that does not produce any economic output.
One of the issues at the root of Pakistan’s electricity problems is the unsustainable demand. Industrial consumption of electricity is a good indicator of that. In 2022-23, the industry consumed only 31,000 GWh (27pc) of electricity from 113,000 GWh. The industry consumed 42pc of electricity in India in the same year. Bangladesh sells 50pc of its electricity to industries. China sells 60pc of its electricity to its industrial sector. In Pakistan, the higher cost of electricity is further reducing industry’s demand. Industry consumed 8.5pc less electricity in 2022-23 than in 2021-22.
Today, residential consumers use half of the electricity produced in the country. Most of the electricity generated does not produce economic output or jobs. We use imported machinery and fuel to produce electricity to meet this demand.
Residential electricity use also contributes to raising electricity prices in two ways. The first impact is seasonal non-utilisation of generation capacity. Space cooling (air conditioning) drives the peak demand in homes. This results in seasonal variation in demand. In FY 2022-23, summer peak demand averaged 29,000 MW. In winter, it was only 18,000 MW. The second impact of residential-dominated consumption is on the average system losses. Industrial supply is often at a higher voltage with T&D losses of 3pc to 5pc compared to 8pc to 10pc for residential supply.
The electricity consumption pattern has deteriorated over the last few decades. In 1980, industry consumed around 36pc of the electricity and residences less than 18pc. The demand profile worsened in the previous 40 years, and we added costly power plants to meet this demand. To illustrate this, between 2010 and 2020, annual industrial electricity use increased by 9,000 GWh. Only one 1,320 MW coal power plant can produce this amount of electricity. It was enough to serve the growth in industrial consumption during that period.
Pakistan needs economic growth. It has a circular problem: it needs cheaper electricity to boost industry, but it needs more industry to lower electricity costs. Natural gas and electricity prices are sensitive to foreign exchange rates. Even Thar coal is dollar-indexed, increasing the economy’s vulnerability.
The gas-based captive power industry uses over 10,000 GWh of electricity a year. Shifting this industry to the electric grid can lower electricity prices. It would cut the T&D losses and spread the cross-subsidy among more consumers.
Developing countries like Pakistan cannot afford to serve the growing non-economic demand. Policymakers may need to consider a 20-year policy of summer loadshedding for the domestic sector. Or they could use a load curtailment policy. Load curtailment means reducing the residential peak demand in summer. Each customer will have a limited maximum allowed load in summer. If customers exceed the summer limit, they must pay a penalty for overloading the system and a higher tariff. Distribution companies can implement load curtailment billing with existing meters. Shaving the peak load will reduce the need for more generation projects.
Policies like load curtailment and loadshedding have a political aspect. They go against citizen expectations. Political parties must own the policy and communicate its needs to the people. Electricity access and supply are part of the political economy. All citizens must have access to electricity. Supply could be only to a manageable extent.
Available solutions to economic problems are complex and political. The collapse is easy to foresee without a legitimate political government implementing reforms.
Writing about policies in today’s institutional and political chaos feels odd. Nonetheless, we should reform the sector, manage demand, and plan for cheaper electricity. Pakistan should focus on the Thar coal cluster for future baseload power. It must use competitive bidding to contract new power plants. It should only do this at the right time and for the required capacity. It needs to focus on industrial supply and suppress residential demand. These will fix some structural issues and support the economy.
وزیر اعظم نے جولائی 2023 میں ایکنک کی منظوری کے بعد 1200 میگاواٹ کے جوہری پلانٹ چشمہ-5 کا افتتاح کیا ۔ مبینہ طور پر اس منصوبے پر تقریبا 4 ارب ڈالر لاگت آئی ۔ تاہم ، ایسا لگتا ہے کہ جب ملک معاشی تباہی کے دہانے پر ہے تو ہم نے اس رقم کو کسی غیر ضروری منصوبے پر خرچ کرنے کا فیصلہ کیا ہے ۔
2021 میں مشترکہ مفادات کی کونسل نے قومی بجلی پالیسی کی منظوری دی ۔ اس پالیسی کا مقصد سستی بجلی فراہم کرنا ہے ۔ اس کے لیے منصوبہ سازوں کو نسل کی توسیع کی منصوبہ بندی کے لیے ماڈلنگ کا استعمال کرنے کی ضرورت ہوتی ہے ۔ انہیں کم سے کم لاگت والی ٹیکنالوجی اور ایندھن کا انتخاب کرنا چاہیے ۔
چشمہ-5 کو کسی بھی ماڈل کے منظر نامے میں جنریشن پلان میں منتخب نہیں کیا گیا تھا ۔ متوقع مانگ کو پورا کرنے کے لیے سستے اختیارات موجود ہیں ۔ چشمہ-5 توسیعی منصوبے میں تھر کوئلے کی جگہ لے لیتا ہے ، جو بیس لوڈ کا دوسرا آپشن ہے ۔ 2021 کے ایک تجزیے سے پتہ چلا ہے کہ چشمہ-5 کم سے کم لاگت والے منصوبے کے مقابلے میں بجلی کی کل سالانہ لاگت میں 500 ملین ڈالر کا اضافہ کرے گا ۔
پاکستان اٹامک انرجی کمیشن نے اس منصوبے کی 60 سالہ عمر پر اس کی کم لاگت کا حوالہ دیتے ہوئے چشمہ-5 کی حمایت کی ہے ۔ تاہم ، سطح پر لاگت صحیح پیمائش نہیں ہے ۔ ٹیرف کے پہلے 20 سال ، جن میں قرض کی ادائیگی کی مدت شامل ہے ، تجزیہ کے لیے زیادہ متعلقہ ہیں ۔
جوہری توانائی کی پیداوار اب پاکستان کے لیے اسٹریٹجک سرمایہ کاری نہیں رہی جیسا کہ پہلے تھی ۔ یہ اب صرف ایک ٹیکنالوجی کا انتخاب ہے-ایک مہنگا انتخاب ۔ اس انتخاب کا کوئی تکنیکی یا معاشی جواز نہیں ہے ۔ آج ، شمسی منصوبے کچھ موجودہ بجلی کی اسکیموں کی جگہ لے سکتے ہیں اگر ان کا ٹیرف متغیر پیداواری لاگت سے کم ہو ۔ ورنہ پاکستان کو آج سپلائی کا مسئلہ نہیں ہے ، اسے مانگ کا مسئلہ ہے ۔
پاکستان کے بجلی کے مسائل کی جڑ میں سے ایک مسئلہ غیر مستحکم طلب ہے ۔
پاکستان نے بجلی کو سپلائی کے مسئلے کے طور پر دیکھا ہے ۔ اس نے ان کے طویل مدتی اثرات کو نظر انداز کرتے ہوئے نئے بجلی کے منصوبوں میں سرمایہ کاری کی ہے ۔ چشمہ-5 کے بغیر بھی جنریشن پائپ لائن ناقابل برداشت ہے ۔ منصوبہ بند پیداواری منصوبوں کے ساتھ بجلی کی لاگت میں مزید اضافہ ہوگا ۔ انجینئرز چوٹی کی مانگ کے 100 فیصد کو پورا کرنے کے لیے بجلی کی صلاحیت کا منصوبہ بناتے ہیں ۔ مانگ کا معیار کوئی معیار نہیں ہے ۔ کم معیار کی طلب بجلی کی کھپت ہے جو کوئی معاشی پیداوار پیدا نہیں کرتی ہے ۔
پاکستان کے بجلی کے مسائل کی جڑ میں سے ایک مسئلہ غیر مستحکم طلب ہے ۔ بجلی کی صنعتی کھپت اس کا ایک اچھا اشارہ ہے ۔ 2022-23 میں ، صنعت نے 113,000 جی ڈبلیو ایچ سے صرف 31,000 جی ڈبلیو ایچ (27 پی سی) بجلی استعمال کی ۔ اسی سال اس صنعت نے ہندوستان میں 42 فیصد بجلی استعمال کی ۔ بنگلہ دیش اپنی 50 فیصد بجلی صنعتوں کو فروخت کرتا ہے ۔ چین اپنی 60 فیصد بجلی اپنے صنعتی شعبے کو فروخت کرتا ہے ۔ پاکستان میں بجلی کی زیادہ قیمت صنعت کی مانگ کو مزید کم کر رہی ہے ۔ صنعت نے 2021-22 کے مقابلے 2022-23 میں 8.5 فیصد کم بجلی استعمال کی ۔
آج رہائشی صارفین ملک میں پیدا ہونے والی بجلی کا نصف استعمال کرتے ہیں ۔ پیدا ہونے والی زیادہ تر بجلی معاشی پیداوار یا روزگار پیدا نہیں کرتی ہے ۔ ہم اس مانگ کو پورا کرنے کے لیے بجلی پیدا کرنے کے لیے درآمد شدہ مشینری اور ایندھن کا استعمال کرتے ہیں ۔
رہائشی بجلی کا استعمال بھی دو طریقوں سے بجلی کی قیمتوں میں اضافے میں معاون ہے ۔ پہلا اثر پیداواری صلاحیت کا موسمی غیر استعمال ہے ۔ اسپیس کولنگ (ایئر کنڈیشنگ) گھروں میں سب سے زیادہ مانگ کو بڑھاتا ہے ۔ اس کے نتیجے میں مانگ میں موسمی تغیر ہوتا ہے ۔ مالی سال 2022-23 میں موسم گرما کی چوٹی مانگ اوسطا 29,000 میگاواٹ رہی ۔ سردیوں میں یہ صرف 18,000 میگاواٹ تھی ۔ رہائشی اکثریتی کھپت کا دوسرا اثر اوسط نظام کے نقصانات پر پڑتا ہے ۔ صنعتی سپلائی اکثر رہائشی سپلائی کے لیے 8 فیصد سے 10 فیصد کے مقابلے میں 3 فیصد سے 5 فیصد کے ٹی اینڈ ڈی نقصانات کے ساتھ زیادہ وولٹیج پر ہوتی ہے ۔
پچھلی چند دہائیوں میں بجلی کی کھپت کا انداز خراب ہوا ہے ۔ 1980 میں صنعت نے تقریبا 36 فیصد بجلی اور 18 فیصد سے کم رہائش گاہیں استعمال کیں ۔ پچھلے 40 سالوں میں مانگ کا خاکہ مزید خراب ہوا ، اور ہم نے اس مانگ کو پورا کرنے کے لیے مہنگے پاور پلانٹس شامل کیے ۔ اس کی مثال کے طور پر ، 2010 اور 2020 کے درمیان ، سالانہ صنعتی بجلی کے استعمال میں 9,000 گیگاواٹ کا اضافہ ہوا ۔ صرف ایک 1,320 میگاواٹ کا کوئلہ پاور پلانٹ اتنی بجلی پیدا کر سکتا ہے ۔ یہ اس عرصے کے دوران صنعتی کھپت میں اضافے کو پورا کرنے کے لیے کافی تھا ۔
پاکستان کو معاشی ترقی کی ضرورت ہے اس کا ایک سرکلر مسئلہ ہے: اسے صنعت کو فروغ دینے کے لیے سستی بجلی کی ضرورت ہے ، لیکن بجلی کی لاگت کو کم کرنے کے لیے اسے مزید صنعت کی ضرورت ہے ۔ قدرتی گیس اور بجلی کی قیمتیں زرمبادلہ کی شرحوں کے لیے حساس ہیں ۔ یہاں تک کہ تھر کوئلہ ڈالر انڈیکسڈ ہے ، جس سے معیشت کی کمزوری میں اضافہ ہوتا ہے ۔
گیس پر مبنی کیپٹیو پاور انڈسٹری ایک سال میں 10,000 گیگاواٹ سے زیادہ بجلی استعمال کرتی ہے ۔ اس صنعت کو برقی گرڈ میں منتقل کرنے سے بجلی کی قیمتیں کم ہو سکتی ہیں ۔ اس سے ٹی اینڈ ڈی کے نقصانات میں کمی آئے گی اور زیادہ صارفین میں کراس سبسڈی پھیل جائے گی ۔
پاکستان جیسے ترقی پذیر ممالک بڑھتی ہوئی غیر اقتصادی مانگ کو پورا کرنے کے متحمل نہیں ہو سکتے ۔ پالیسی سازوں کو گھریلو شعبے کے لیے سمر لوڈشیڈنگ کی 20 سالہ پالیسی پر غور کرنے کی ضرورت پڑ سکتی ہے ۔ یا وہ بوجھ کم کرنے کی پالیسی استعمال کر سکتے ہیں ۔ لوڈ کٹوتی کا مطلب گرمیوں میں رہائشی چوٹی کی مانگ کو کم کرنا ہے ۔ ہر گاہک کے پاس موسم گرما میں محدود زیادہ سے زیادہ اجازت شدہ بوجھ ہوگا ۔ اگر گاہک موسم گرما کی حد سے تجاوز کرتے ہیں ، تو انہیں سسٹم پر زیادہ بوجھ ڈالنے پر جرمانہ اور زیادہ ٹیرف ادا کرنا ہوگا ۔ تقسیم کار کمپنیاں موجودہ میٹر کے ساتھ لوڈ کٹوتی بلنگ کو نافذ کر سکتی ہیں ۔ پیک لوڈ کو مونڈنے سے مزید جنریشن پروجیکٹوں کی ضرورت کم ہو جائے گی ۔
لوڈ کٹوتی اور لوڈشیڈنگ جیسی پالیسیوں کا ایک سیاسی پہلو ہے ۔ وہ شہریوں کی توقعات کے خلاف ہیں ۔ سیاسی جماعتوں کو پالیسی کا مالک ہونا چاہیے اور اس کی ضروریات کو لوگوں تک پہنچانا چاہیے ۔ بجلی تک رسائی اور سپلائی سیاسی معیشت کا حصہ ہیں ۔ تمام شہریوں کو بجلی تک رسائی حاصل ہونی چاہیے ۔ سپلائی صرف قابل انتظام حد تک ہو سکتی ہے ۔
معاشی مسائل کے دستیاب حل پیچیدہ اور سیاسی ہوتے ہیں ۔ اصلاحات کو نافذ کرنے والی جائز سیاسی حکومت کے بغیر اس تباہی کا اندازہ لگانا آسان ہے ۔
آج کے ادارہ جاتی اور سیاسی افراتفری میں پالیسیوں کے بارے میں لکھنا عجیب لگتا ہے ۔ اس کے باوجود ، ہمیں اس شعبے میں اصلاحات کرنی چاہئیں ، مانگ کا انتظام کرنا چاہیے ، اور سستی بجلی کے لیے منصوبہ بنانا چاہیے ۔ پاکستان کو مستقبل کی بیس لوڈ پاور کے لیے تھر کوئلے کے کلسٹر پر توجہ دینی چاہیے ۔ اسے نئے پاور پلانٹس کے معاہدے کے لیے مسابقتی بولی کا استعمال کرنا چاہیے ۔ اسے یہ صرف صحیح وقت پر اور مطلوبہ صلاحیت کے لیے کرنا چاہیے ۔ اسے صنعتی سپلائی پر توجہ مرکوز کرنے اور رہائشی مانگ کو دبانے کی ضرورت ہے ۔ یہ کچھ ساختی مسائل کو حل کریں گے اور معیشت کی مدد کریں گے ۔